CHALLENGE™/Onyx™ XL Rackmount Installation Instructions
Next
CHALLENGE™/Onyx™ XL Rackmount Installation Instructions
Document Number: 108-7042-020
Front Matter
|
List of Figures
|
List of Tables
|
Table of Contents
Introduction
Product Overview
1.
Chassis Tour
Overview
Cardcages, Backplanes, and I/O Panels
System Controller
SCSI Drive Boxes
Front-loading Devices
Power Supplies and Power Distribution
2.
Theory of Operations
Everest Board Set Overview
Everest CPU Board (IP19)
Everest Memory Board (MC3)
Everest I/O (POWERchannel 2) Subsystem
Power Boards
RealityEngine2 and VTX Graphics Subsystems
3.
Installation
Safety
Restrictions and Important Notes
Site Requirements
Unpacking
System Installation
Storage Devices
Optional Equipment
Bringing the System Up and Down
Software Installation
Remove and Replace Procedures
Optional Third Cardcage (Cardcage 3) and Power Supply Tray
Software Configuration
Upgrading the PROM on the System Controller Board
A.
Specifications
Physical Characteristics
Environmental Specifications
Monitor Specifications
B.
Drive Maintenance
Operating and Maintaining the 4-mm DAT and 8-mm Tape Drives
Archive Python 4320 NT (4-mm DAT Drive)
Exabyte 8-mm Tape Drive
CD-ROM Care and Maintenance
150-MB Tape Drive Preventive Maintenance
C.
Connectors and Cables
Connectors
Monitor Cables
Input Device Cables
System Interrupt Cable
D.
Supplementary SCSI Information
Supported SCSI Protocols for Challenge/Onyx Products
Identifying SCSI Channel Components
Configuring a SCSI Channel
Labels on a SCSI Channel
E.
System Controller Error and Status Messages
CPU Status Messages
System Error Messages
System Event Messages
Internal System Controller Error Messages
System Controller Messages
System Controller Diagnostic Codes
F.
Board Fault LED Error Messages
IP19 CPU Board
MC3 Memory Board
IO4/VCAM Board
Remote VCAM (RMT_VCAM) Board
Mezzanine (F Mezz and S Mezz) Boards
SCSIBox Drive Enclosure
Index