CHALLENGE™ Vault Rack and SCSIBox 2 Installation Instructions

Document Number: 108-7044-040

Front Matter

| List of Figures | List of Tables |


Table of Contents

1. General Information
Manual Organization
Safety Information
Vault Features
CHALLENGE Vault SCSIBox 2 Features
Minimum Hardware and Software Requirements

2. Components
Single-Ended SCSIBox 2
Differential SCSIBox 2
Vault Rack

3. Specifications
Vault Specifications
SCSIBox 2 Specifications

4. Chassis Tour
SCSIBox 2 Chassis Tour
SCSIBox 2 Configurations
Differential-to-Single-ended SCSI Converter Boards
Vault Chassis Tour

5. Installation
Preinstallation Checklist
Installing a SCSIBOX 2
Installing and Removing SCSIBox 2 Drives
Distinguishing Between Single-Ended and Differential Devices
Cabling the Vault Rack and SCSIBox 2
Connecting Two Racks
Labels on a SCSI Channel

6. Verifying Installation
General Procedures
Running MAKEDEV
Running the fx Utility

7. Software Guidelines
Disk Striping
New Addressing Scheme for Drives