List of Figures
| Table of Contents | List of Figures | List of Tables | List of Procedures |
- Figure 1-1. Example SGI ICE X System
- Figure 1-2. Three VLANs
- Figure 3-1. SGI ICE X Software Installation Process
- Figure 3-2. SAC Power On Button and DVD Drive
- Figure 3-3. Network Card Setup Screen
- Figure 3-4. Initial Configuration Check Screen
- Figure 3-5. Initial Cluster Setup Screen with the initial
screen
- Figure 3-6. Initial Cluster Setup Tasks Screen
- Figure 3-7. Subnet Network Addresses Screen
- Figure 3-8. Configure House DNS Resolvers Screen
- Figure 3-9. Configure Switch Management Network screen
- Figure 3-10. Primary Switch Stack With Two Switches
- Figure 3-11. Switch Stack With Multiple Switches
- Figure 3-12. Configure Backup DNS Server (service node)
screen
- Figure 3-13. Completed InfiniBand (ib0) Master / Standby
Screen
- Figure B-1. VLAN Overview
- Figure B-2. SGI ICE X Management Switch Connections
- Figure B-3. HEAD VLAN Ethernet Connections
- Figure B-4. RACKx VLAN Ethernet Connections
- Figure B-5. MCell Cooling VLAN
- Figure B-6. SGI ICE X M-Rack Network Connections
- Figure B-7. SGI ICE X M-Rack with MIC Devices
- Figure B-8. Redundant Cascaded Switch Configuration
- Figure B-9. Nonredundant Cascaded Switch Network Configuration