All components that have been replaced must be returned. This procedure is not optional. Shipping boxes are included in the upgrade kit.
Pack the old components in the boxes and antistatic bags provided. Ensure that the IP22 base board and the CPU module are packed to withstand the rigors of surface and air freight transportation.