List of Tables

| Table of Contents | List of Figures | List of Tables |

Table 2-1. Site Preparation Checklist
Table 2-2. Deskside Airflow Clearances
Table 2-3. Deskside Physical Specifications
Table 2-4. Rackmount Floor-Load Requirements
Table 2-5. Rackmount Physical Specifications
Table 2-6. Indy Workstation Physical Specifications
Table 2-7. IRISconsole Physical Specifications
Table 2-8. Multi-Port HIPPI Switch Physical Specifications
Table 2-9. Tools Required for Receiving and Installing Systems
Table 2-10. Shipping Dimensions
Table 2-11. Deskside Environmental Specifications
Table 2-12. Rackmount Environmental Specifications
Table 2-13. Indy Environmental Specifications
Table 2-14. IRISconsole (SPM) Environmental Specifications
Table 2-15. Multi-Port HIPPI Switch Environmental Specifications
Table 2-16. Array Heat Dissipation (Rackmount Nodes)
Table 2-17. Array Heat Dissipation (Deskside Nodes)
Table 2-18. CHALLENGE/Onyx Vibration Limits
Table 2-19. Rackmount, Deskside, and Indy Acoustic Levels
Table 2-20. Indy Workstation Power Specifications
Table 2-21. SPM IRISconsole Power Specifications
Table 2-22. CHALLENGE and Onyx System Power Requirements
Table 2-23. Deskside Array Power Consumption
Table 2-24. Rackmount Array Power Consumption
Table 3-1. Preinstallation Checklist
Table 3-2. Array Parts List