List of Figures

| Table of Contents | List of Figures | List of Tables |

Figure 1-1. Basic System Shipment Contents
Figure 1-2. Lifting the System
Figure 1-3. Front View of the System
Figure 1-4. System Rear Panel Items
Figure 1-5. Connecting theUSB K eyboard and Mouse Cables
Figure 1-6. Connecting the Ethernet Cable
Figure 1-7. Connecting the Monitor Cable Example
Figure 1-8. Connecting the System and Mo nitor Power Cables Example
Figure 1-9. Powering On the System and Monitor Example
Figure 1-10. Example of Powering Off the System Using the Front Power Button
Figure 1-11. Power Button and Reset Switch
Figure 2-1. System Enclosure Layout (Right-front view with side-panel removed)
Figure 2-2. System Enclosure Layout (Rear View)
Figure 2-3. Memory DIMM Group Locations
Figure 2-4. System Base I/O Board External Connectors
Figure 2-5. Seria Port Adapter Cable Connection
Figure 2-6. Static I/O Daughter Card Connectors
Figure 2-7. Hard Disk Drive Sled
Figure 2-8. Internal Hard Disk Drive Locations
Figure 2-9. Locating the Graphics Board(s)
Figure 2-10. PCI Buses and Slots
Figure 2-11. Power Supply Location
Figure 2-12. Cooling System Components
Figure 3-1. Powering Off the System
Figure 3-2. Moving the system
Figure 3-3. Removing the Enclosure Side Panel
Figure 3-4. Removing the Bezel
Figure 3-5. Installing the Bezel and Door Assembly
Figure 3-6. Replacing the Side Panel
Figure 3-7. Reconnecting the Cables to the System
Figure 3-8. Layout of Slots and DIMM Memory Groups
Figure 3-9. Removing a DIMM
Figure 3-10. DIMM Installation Example
Figure 3-11. Locating the Notches on a DIMM
Figure 3-12. Installing an Internal Hard Disk Drive
Figure 3-13. Removing an Internal Hard Disk Drive
Figure 3-14. Removing the DVD-ROM Drive
Figure 3-15. Installing the DVD-ROM Drive
Figure 3-16. Disconnecting the Cables and Retention Strap
Figure 3-17. Opening the PCI Gate
Figure 3-18. Removing the Base I/O Board
Figure 3-19. Opening the PCI Gate
Figure 3-20. Installing the Base I/O Board
Figure 3-21. Connecting the Base I/O SATA and IDE Cables
Figure 3-22. Closing the PCI Gate
Figure 3-23. Opening the PCI Gate
Figure 3-24. Installing the PCI Board
Figure 3-25. Closing the PCI Gate
Figure 3-26. Opening the PCI Gate
Figure 3-27. Graphics Card Synchronization Cable Example
Figure 3-28. Removing a PCI Board
Figure 3-29. Replacing the Fan Wall
Figure 3-30. Removing the Hard Disk Drive Fan
Figure 3-31. Installing the Hard Disk Drive Fan
Figure 3-32. Replacing the Rear Fan Assembly
Figure 3-33. Removing the L1 Display Cable
Figure 3-34. Installing the L1 Display Cable
Figure 3-35. Replacing the LED Cable
Figure 3-36. Replacing the IDE DVD-ROM Drive Cable
Figure 3-37. Removing the L1 Display Board
Figure 3-38. Installing the L1 Display Board
Figure 4-1. Full Support Sequence Example
Figure 4-2. Four Monitors in a Line
Figure 4-3. Four Monitors in a Square
Figure A-1. Ethernet 10-100-1000 Base-T Port Pinout and Location
Figure A-2. USB (Type A) Keyboard and Mouse Port Pinouts and Locations
Figure A-3. System Console Serial Port Pinout and Location
Figure A-4. Pin Number Locations for 36-pin MDR Connector
Figure A-5. DVI-I Port Pinout and Location
Figure B-1. VCCI Notice (Japan Only)
Figure B-2. Chinese Class A Regulatory Notice
Figure B-3. Korean Class A Regulatory Notice