Silicon Graphics® Octane®/Octane2™ Workstation
VPro™ Graphics Upgrade Kit
Installation Guide List of Figures
| Table of Contents | List of Figures | List of Tables |
- Figure 1. Hardware Inventory List
- Figure 2. Displaying the Installed Version of IRIX
- Figure 3. Powering Off the Workstation
- Figure 4. Removing the Monitor Cable
- Figure 5. Attaching the Wrist Strap
- Figure 6. Identifying the Compression Connector
- Figure 7. Loosening the XIO Module Screws
- Figure 8. Releasing the XIO Quad-Module
- Figure 9. Removing the XIO Quad-Module
- Figure 10. Loosening the XIO Tri-Module Screws
- Figure 11. Releasing the XIO Tri-Module
- Figure 12. Removing the XIO Tri-Module
- Figure 13. XIO Tri-Module
- Figure 14. Inserting the XIO Tri-Module
- Figure 15. Tightening the XIO Tri-Module Captive Screws
- Figure 16. Reconnecting the Monitor Cable
- Figure 17. XIO Tri-Module with VPro Graphics I/O Ports
- Figure 18. Powering On the Workstation
- Figure 19. Identifying the Slots Used by an XIO Option Board
- Figure 20. Placing the Cap on the XIO Compression Connector
- Figure 21. Removing the Screws from the Blank Panel
- Figure 22. Removing the Blank Panel
- Figure 23. Installing the Screws
- Figure 24. Removing the Cap from the Option Board Compression Connector